work history (through fall 2009):

2001 to current – Kirk H. Shultz designs – design, plan, draft – 503 307 1766

2001 – Dull Olsen Weeks Architects – 503 226 6950

2000 – Sienna Architects – Portland, Or. 503 227 5616

1997-1999 – Dull Olsen Weeks Architects – 503 226 6950

1995-1997 – Sienna Architects – Portland, Or. 503 227 5616

1993 –1995 – Contract work with various Portland Architects

1992 –1993 – Building personal residence in Lake Oswego, Or.

1987-1992 – JKS Architects – Portland, Or.

1985 –1987 – Red Lion Hotels – Vancouver, Wa.

1984-1985 – Color and Design Exhibits, Portland, Or.

1983 – Monaco Motor Homes – Junction City, Or.


job experience statement:


I have a broad range of experience, starting as a carpenter in the seventies, student of music and architecture into the eighties, and 26 years of architectural and construction related work since. I have worked in many phases of design and construction, from planning through design to specifications, construction administration and building. The last few years have seen a lot of residential projects, designing, drafting and helping clients get permits through the City. I have also been receiving event-planning commissions. I operate as a sole proprietor architect/planner/designer from my home office. I have at times worked on a contract/project basis with firms or in a design build relationship with a contractor.


credentials:

Registered Architect - State of Washington #6716 – 1993 - current

University of Oregon - Bachelor of Architecture - 1983


references:

Jack Makarchek – Job Superintendent, Chambers Construction – 541 570 2923

Jean Hart -client – 509 365 3336

Bernice Gevurtz - client– 503 913 5320

Saskia Dressler – Principle Wilsonville Art Tech High School – 503 804 5189

Thomas Paul Augustine – Director Janice Griffin Gallery -503 241 8313

  Mike Latham - client, Principal – SQ. FT. Construction – 503 680 4828

Dan Burton - Project Manager – Perkowitz and Ruth Architects – 503 478 9900

Peter Swindler -client- Senior Sales - Hesse Coatings - 773 251 5819

  Steve Wiznovsky - Site Manager – Oregon Country Fair - 541 935 7846

Steve Olsen – Dull, Olsen,Weeks Architects – 503 226 6950

Warren Tyler – Associate, PKA Architects – 503 968 6800



project experience(partial list):


Construction Management work:

Dressler residence remodel – manage and build during construction - $195, 000 remodel. 2008-09

Portland Public Schools - information technology, upgrades at 32 facilities - Portland, Or. School bond work - DOWA - 1998 thru 2000

Architectural Project Manger, construction management phase.

Central Linn School District - roofing, mechanical and technology upgrades at two facilities. School bond work - Halsey, Or. DOWA - 1997

Architectural Project Manager, construction management phase.


Architectural Design, Drafting and Project Management Work:


Residential:

Swindler residence – additions – Portland, Or. - Design and draft – $125,000 budget 2009


Mitchel/Riggs residence – Additions and remodels – Portland, Or. - Design and draft

$160,000 budget 2009


Bernice Gervurtz – designs and consultations – various properties – Portland, Or.

2009

Dressler residence- Major remodel including house lift and new basement- Portland, Or. - Design, draft, manage and build-$190,000 budget -2008-09


Small /Grew residence -Addition – Portland, Or. – Design and draft

900sf addition- $160,000 budget - 2008


McCall residence – convert large garage into two bedrooms and bath to expand an owner occupied duplex apartment – Portland, Or. - $ 65,000 budget - 2008


Bob and Jean Hart – New home – Lyle, Wa.

Design and draft 1400-sf home on view property in Gorge.

$200,000 budget - 2007


Libby/Gross residence – addition – Portland, Or.

1100-sf two story addition to residence - $125,000 budget - 2007


Roots Realty – Occupancy Change for realty office – Portland, Or.

Drawings and work with City to convert exiting residence use into office use.

2007


Tucker residence – addition – Washington County, Or.

Design, draft and obtain permits and bids for master suite addition.

2007


Clark Salisbury – Recording studio – Portland, Or.

Design and draft for 1600-sf professional sound and recording studio.

2006-2007


Schrieber residence – addition – West Linn, Or.

400-sf addition to historic 1904 Queen Anne residence.

2006


Newhall residence – New timber frame home – Sauvies Island, Or.

2,200 sf - 2006


McCulloch residence – remodel and accessory dwelling unit – Portland, Or.

Designed basement structure to raise building and convert to duplex - 2006


Avalon residence – remodel – West Linn, Or.

Master bath and suite remodel to 1948 residence.

2006


Henderson properties - Gene Halase owner – Portland Or.

Design and draft permit drawings for remodels and basement conversions in 16 residential properties. Design new home for lots in flood plain.

2005 - 2006


McCulloch residence – remodel and accessory dwelling unit – Portland, Or.

Designed basement structure to raise building and add 4 rooms and designed separate 800 s.f. cottage - 2005


Green St. residence – multi story deck – West Linn, Or.

Design and draft plans for Three story view deck – 2004


Rohde residence – remodel – West Linn, Or.

Convert deck and bedroom into master suite - 2004


Stewart residence - remodel – Gladstone, Or.

500 s.f. room design in bonus space – 2004


DesChamps house remodel – West Linn, Or.

1,500 s.f. second story addition design – 2003


Matthews residence- house remodel – West Linn, Or.

1,300 s.f. addition design. - 2003


Hart property- vacation home - Lyle, Wa.

1,000 s.f. retreat cabin in the gorge.

2003


Tabor residence- greenhouse addition– Eugene, Or.

Design of greenhouse addition to residence.

2002


Swindler property –new residence - Toas, NM.

Design through bid phases adobe and straw bale home.

1996


  Forest Grove Care Home - HUD housing project - Forest Grove, Or. -

  William Wilson Architects - 1993

Job Captain, schematic design through construction document phases.


Shultz property – new residence - Lake Oswego, Or - design and build pole frame “Eco” home for Kirk H Shultz Architect - 1992 - 1993

all phases, conception thru construction.


Linnton School Town Houses - conversion of historic school to residences - Portland, Or. - JKS Architects - 1990

Job Captain, design development through construction management phases.


Retail:

  Janice Griffin Gallery – Portland , Or.

Design and construction of art gallery and studio workspace in the Pearl District – 2003

Fossil Cartel tenant improvement – Portland, Or.

Design and project management of retail store interior in Pioneer Place – 2002


Griffin art studio – West Linn, Or.

Design and project management of art studio, gallery and kiln building – 2002



Tanasbourne West - retail site and tenant buildings – Hillsboro, Or – Sienna Architecture Co. - 2000 – 2001 Project Manager, site construction management and tenant building design.


Fred Meyer Fairbanks - preliminary site report - Fairbanks, Alaska - Sienna Architects - 1995

Report of project criteria, for executive planning uses.


  Albertson’s Grants Pass - retail site design - Grants Pass, Or. - Sienna Architects –

  1995 Project Manger, construction document and bid phases.


Fred Meyer Salt Lake City Downtown - new retail building - Salt Lake City, Utah - JKS Architects - 1994

Job Captain, construction document phase.


Wilsonville Towne Center Pad Nine - retail pad building – JKS Architects - 1994

Job Captain, construction document phase.


Fred Meyer Aurora - major retail remodel - Aurora, Wa. - JKS Architects - 1991

Job Captain, schematic design through construction document phases.

Fred Meyer Burlingame - major retail remodel - Portland, Or. - JKS Architects - 1989

Job Captain, design development through construction document phases.


Fred Meyer Auburn - new retail building - Auburn , Wa. - JKS - architects - 1987

Senior Draftsman, construction document phase.

Hospitality:

Marriot Fairview Hotel Kruse Way - Lake Oswego, Or. - Ankrom Moisan Architects - 1997

Job Captain, construction document phase.


Kah-nee-ta Gaming Facility - additions to lodge - Warm Springs, Or - Sienna Architects - 1995

Job Captain, construction document phase.


Red Lion Inn Colorado Springs - new hotel and conference building interior - Colorado Springs, co. - Red Lion Hotels - 1985-86

Interior designer and draftsman, schematic through construction phases.


Commercial:

Foster St. commercial space – Portland, Or.

Researched occupancy issues and designed remodel to bring healing arts and event center space into compliance - 2005


Sysco Food Distribution Facility Upgrade - Wilsonville, Or. - CSCB Architects - 1996

Project Manger, construction document and construction management phases.


Maletis Beverage Distribution Facility - light industrial and office building - Portland, Or. JKS Architects - 1988

Senior Draftsman, construction documents phase.


Event Planning, Festival Layout, Theater sets and Art installation work:


Oregon Country Fair – path layout planning studies – Veneta, Or.

Head of planing committee for designing and installing new paths and areas at the fair –1994 – 2004 committee member 2005 -current


Oregon Country Fair - design and construction of festival facilities, volunteer work - 1987-current Co-Coordinator for 110 person volunteer crew since 1999 with focus on vendor booth structure safety and compliance. Authored construction standards manual.


Wilsonville Theatre Company – Frog Pond Grange - Wilsonville, Oregon -Design and built sets for two community theater plays. Rutherford Wolf -Oct 2008 and A Ferry Tale – 2009. Taught Theater “summer camp” in set design and theater tech 2009. Acted in both plays – consulted with Grange on building repairs and stage upgrades.


Oregon State Fair – design and install ‘Liveart” area – Salem, Or. Designed two acre area for vendor and stage and art projects as a partnership with the Oregon State Fair and the Oregon Country Fair. This was a new State Fair offering in – 2005 and 2006


Her’ – Mural design and installation – Salem, Or.  Designed, commissioned and installed a 140‘L x 23’H Canvas and wood frame Mural of a reclining woman. Used as a Stage surround and performance area wall. This was installed in conjunction with the State Fair LiveArt project

2005 and 2006.


Krayon Kids - set designs for fall theater production - Oregon City, Or.  Designed and built various sets for childrens theater troupe – 2003 , 2004 and 2005


Dancing Dragons – festival layout design – Horning’s Hideout North Plains, Or. Layout and design work for setting up three day festival at Horning’s Hideout - 2004


Color and Design Co. – Trade show and museum exhibits – Portland, Or. designer, draftsman, shop drawings - 1984


Other:

ODOT – professional review of imminent domain sites, appraisals and impacts for use in dispute resolutions – 2000 – 2001


Roseburg High School –PE/Wellness Facility – Roseburg, Or. – DOWA – 2001

  Designed coordinated and drafted multi use gymnasium.

V.A. Hospital 8th Floor - remodel - Portland, Or. - Peterson Kohlberg Architects - 1994 - Job Captain, construction documents and bid phase.

Monaco Motor Homes – cabinet design and shop drawings – Junction City, Or. - 1983



 